Bullo River Station - Stage 1
FredBuild undertook this job in early 2019. Our backs were up against the wall due to the job starting right in the middle of the wet season and needing to be completed by the end of March in time for the tourist season.
The job consisted of:
An upgrade to the guest accommodation including a new hardwood timber veranda, concrete footpaths and landscaping
Upgrade of the outdoor dining area with new flagstone paving, stone bench seating and installation of the fire pit
Installation of two large timber shade structures, one with stone day beds, and red gravel paths laid through out
Installation of a new 25m guest pool
This was the first job that we undertook at Bullo River Station. The whole project was a success overall which has meant the development of a great relationship with the client, now having moved on to complete stage 2 (Rayner’s Camp) and continue with stages 3 and 4.
What a great place to work.
January 2019 - on our way out to Bullo River Station trying to beat the rain and the tourist season.
January 2019 - on our way out to Bullo River Station trying to beat the rain and the tourist season.
January 2019 - on our way out to Bullo River Station trying to beat the rain and the tourist season.
Before the works began.
Before the works began.
Before the works began.
The track to Bullo claims another truck!
The track to Bullo claims another truck!

The track to Bullo claims another truck!
Ready for the timber work to commence.
Ready for the timber work to commence.
And the stone work begins.
And the stone work begins.

And the stone work begins.
Nothing like a bit of rain to make things tricky.
Nothing like a bit of rain to make things tricky.
Nothing like a bit of rain to make things tricky.
The stone work continues and the outdoor areas start to take shape.
The stone work continues and the outdoor areas start to take shape.
The stone work continues and the outdoor areas start to take shape.
Installation of the fire pit.
Installation of the fire pit.

Timber shade structure with stone day beds.

25m guest pool installation.
Timber work around the gusset accommodation.
Getting close with the outdoor dining area!
Finally finshed - outdoor sitting area.
Finally finished.
Finally finished.

Finished fire pit.
Finished fire pit.
Finished fire pit.

Hand laid local flagstone from the station.

Hand laid local flagstone from the station.

Day bed in the timber shade structure.
Relaxation central in the hammock.
Relaxation central in the hammock.
Landscaping action.
Landscaping action.
Landscaping action.
Time to kick back and enjoy the finished product.